Scheduling Lean Manufacturing Systems an der TU München

Karteikarten und Zusammenfassungen für Scheduling Lean Manufacturing Systems an der TU München

Arrow Arrow

Komplett kostenfrei

studysmarter schule studium
d

4.5 /5

studysmarter schule studium
d

4.8 /5

studysmarter schule studium
d

4.5 /5

studysmarter schule studium
d

4.8 /5

Lerne jetzt mit Karteikarten und Zusammenfassungen für den Kurs Scheduling Lean Manufacturing Systems an der TU München.

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

Example for a Heuristic Method?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

Which different models are there considering the machine configurations?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What performance measures are there?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What are the objectives of the flexible flow line loading (FFLL) algorithm?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What is done in the first phase of the FFLL?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What are the characteristics of sequencing an unpaced assembly system?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

How does the profile fitting heuristic work?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What are the characteristics of a flexible flow system with bypass?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What dispatching rules, dependent on release- or due date, are there?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What are the three phases of the flexible flow line loading (FFLL) algorithm?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What dispatching rules, dependent on processing times, are there?

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

What dispatching rules (miscellaneous) are there?

Kommilitonen im Kurs Scheduling Lean Manufacturing Systems an der TU München. erstellen und teilen Zusammenfassungen, Karteikarten, Lernpläne und andere Lernmaterialien mit der intelligenten StudySmarter Lernapp. Jetzt mitmachen!

Jetzt mitmachen!

Flashcard Flashcard

Beispielhafte Karteikarten für Scheduling Lean Manufacturing Systems an der TU München auf StudySmarter:

Scheduling Lean Manufacturing Systems

Example for a Heuristic Method?
Dispatching/priority rules

Scheduling Lean Manufacturing Systems

Which different models are there considering the machine configurations?
single machine models parallel machine models flow shop models job shop models supply chain models

Scheduling Lean Manufacturing Systems

What performance measures are there?
Throughput (and Makespan) Due dates: - Lateness (positive and negative) - Tardiness (positive/late only) Costs: - Setup Costs - WIP, Inventory Costs - Finished Goods Inventory Costs - Transportation Costs

Scheduling Lean Manufacturing Systems

What are the objectives of the flexible flow line loading (FFLL) algorithm?
- maximize throughput (minimize makespan) - minimize WIP (reduce blocking probabilities)

Scheduling Lean Manufacturing Systems

What is done in the first phase of the FFLL?
each job is assigned to a machine workloads are balanced by using the longest processing time (LPT) heuristic: - assume all jobs are available at the same time - sort jobs in decreasing order of their processing times - whenever one of the machines is freed, select jobs with LPT

Scheduling Lean Manufacturing Systems

What are the characteristics of sequencing an unpaced assembly system?
- number of machines/workstations in series (given) - line is unpaced - finite buffers between machines (blocking / starving) - goal: maximize throughput

Scheduling Lean Manufacturing Systems

How does the profile fitting heuristic work?
1. Select the first job 2. Calculate profile X_i,j1 (departure time of job j1 from machine i) 3. Determine which job goes next by computing for each remaining job machine idle time and blocking time and select smallest nonproductive time 4. Calculate new profile and repeat procedure until all jobs are scheduled

Scheduling Lean Manufacturing Systems

What are the characteristics of a flexible flow system with bypass?
- flow system with buffers and bypass - machines in parallel at workcenters - job is processed on any machine or it can bypass the workcenter

Scheduling Lean Manufacturing Systems

What dispatching rules, dependent on release- or due date, are there?
ERD - Earliest Release Date (= FCFS - First Come First Serve) EDD - Earliest Due Date MS - Minimum Slack (first)

Scheduling Lean Manufacturing Systems

What are the three phases of the flexible flow line loading (FFLL) algorithm?
1. machine allocation 2. sequencing 3. release timing

Scheduling Lean Manufacturing Systems

What dispatching rules, dependent on processing times, are there?
LPT - Longest Processing Time SPT - Shortest Processing Time WSPT - Weighted Shortest Processing Time CP - Critical Path LNS - Largest Number of Successors

Scheduling Lean Manufacturing Systems

What dispatching rules (miscellaneous) are there?
SST - Shortest Setup Time (first) LFJ - Least Flexible Job (first) RANDOM

Melde dich jetzt kostenfrei an um alle Karteikarten und Zusammenfassungen für Scheduling Lean Manufacturing Systems an der TU München zu sehen

Singup Image Singup Image
Wave

Andere Kurse aus deinem Studiengang

Für deinen Studiengang Scheduling Lean Manufacturing Systems an der TU München gibt es bereits viele Kurse auf StudySmarter, denen du beitreten kannst. Karteikarten, Zusammenfassungen und vieles mehr warten auf dich.

Zurück zur TU München Übersichtsseite

Business Analytics

Investment and Financial Management

International relations

User Modeling and Recommender Systems

CH2: Consumer Behavior

CH3: Consumer Behavior

CH4: Consumer Behavior

CH5: Consumer Behavior

CH8: Consumer Behavior

CH10: Consumer Behavior

CH11: Consumer Behavior

CH12: Consumer Behavior

Français

Marketing

R Codes

Anorganische

AC Verbindungen_Tutorien

Advanced International Experience

Einsatz und Realisierung von Datenbanken

chemiesoftware

Organische Chemie

Die Chemische Industrie

Planung technischer Logistik Systeme

Reaktionstechnik

Was ist StudySmarter?

Was ist StudySmarter?

StudySmarter ist eine intelligente Lernapp für Studenten. Mit StudySmarter kannst du dir effizient und spielerisch Karteikarten, Zusammenfassungen, Mind-Maps, Lernpläne und mehr erstellen. Erstelle deine eigenen Karteikarten z.B. für Scheduling Lean Manufacturing Systems an der TU München oder greife auf tausende Lernmaterialien deiner Kommilitonen zu. Egal, ob an deiner Uni oder an anderen Universitäten. Hunderttausende Studierende bereiten sich mit StudySmarter effizient auf ihre Klausuren vor. Erhältlich auf Web, Android & iOS. Komplett kostenfrei. Keine Haken.

Awards

Bestes EdTech Startup in Deutschland

Awards
Awards

European Youth Award in Smart Learning

Awards
Awards

Bestes EdTech Startup in Europa

Awards
Awards

Bestes EdTech Startup in Deutschland

Awards
Awards

European Youth Award in Smart Learning

Awards
Awards

Bestes EdTech Startup in Europa

Awards