PM/ Project Management at Hochschule München | Flashcards & Summaries

Lernmaterialien für PM/ Project Management an der Hochschule München

Greife auf kostenlose Karteikarten, Zusammenfassungen, Übungsaufgaben und Altklausuren für deinen PM/ Project Management Kurs an der Hochschule München zu.

TESTE DEIN WISSEN
Was ist das Triple Constraint?
Lösung anzeigen
TESTE DEIN WISSEN
-Magic Triangle
              Time    -    Cost 
                     -Quality-
-Each criteria is influenced by and influencing the others
-PM is proven to be the best way to achieve the best out of all three
Lösung ausblenden
TESTE DEIN WISSEN
Def. of Project
Lösung anzeigen
TESTE DEIN WISSEN
A unique and temporary process, with coordinated and controlled activities, a definite start and finish date, it achieve a unique objective (product, Software or Service), has specific requirements, has a defined and accepted risk.
It ends when the objectives are achieved or they cannot be met as terminated
Lösung ausblenden
TESTE DEIN WISSEN
Welche Elemente dürfen bei einem system nicht vergessen werden ?

Lösung anzeigen
TESTE DEIN WISSEN

SPIT       Tepidoil
Social.    People Organization
Process/Practice   Doctrine Trining
Information.     Information 
Technical.  Equipment Infrastructure Logistics
Lösung ausblenden
TESTE DEIN WISSEN
Def. of system
Lösung anzeigen
TESTE DEIN WISSEN
is a combination of interacting elements organized to achieve toghether one or more stated purposes


need the interaction of the elements to achieve the stated purpose(s)
Lösung ausblenden
TESTE DEIN WISSEN
SE deals with?
Lösung anzeigen
TESTE DEIN WISSEN
MINIMIZING Risk by preventing undesirable emergent properties 
MAXIMIZING desirable emergence 
Lösung ausblenden
TESTE DEIN WISSEN
Is SE worth the effort?
Lösung anzeigen
TESTE DEIN WISSEN
Avoid integration problems see Europa launcher 
Higher Performance 
Rule Of Ten/Frontloading: Every Phase the cost factor multiplies with 10, Put more effort in the Early Phases such as requirement and design phase, can safe much money and time - Frontloading
Lösung ausblenden
TESTE DEIN WISSEN
Was trifft auf PM zu?

Lösung anzeigen
TESTE DEIN WISSEN
one of the most crucial disciplines 
Lösung ausblenden
TESTE DEIN WISSEN
Nenne Beispiele für Disziplinen welche vom Systems engineer beachtet werden müssen. In versch. Kategorien einteilen: Fachdisziplinen, Subsysteme, System Life Cycle und Stakeholder
Lösung anzeigen
TESTE DEIN WISSEN
Stakeholder: Kunde, Marketing, Finanzen und Controlling, PM, Einkauf, Supplier Händler,…
Fachdisziplinen: Software Engineer , Mech Engineer, ETechnik, Thermische Auslegung, EMV,…..
Subystem A , B(Triebwerk), C(Elektrik), ….
System Life Cycle: Forschung, InstandhaltungService, Test Zulassung, Produktion und Planung, Entsorgung
Lösung ausblenden
TESTE DEIN WISSEN
Nenne Succes Factors of SE
Lösung anzeigen
TESTE DEIN WISSEN
Frontloading 
Focus on stakeholders 
Optimize the whole, focus on optimum architectures and interfaces
Systematische und Strikte Herangehensweise
Lösung ausblenden
TESTE DEIN WISSEN
Was sind die grundlegenden Concepts of SE ?
Lösung anzeigen
TESTE DEIN WISSEN
-Systems Thinking
-Life Cycle Models
Lösung ausblenden
TESTE DEIN WISSEN
Definition of the System Vision
Lösung anzeigen
TESTE DEIN WISSEN
System Purpose is the answer to the question WHY (WHAT FOR) the system is needed and states also the key success criteria and constraints 
Lösung ausblenden
TESTE DEIN WISSEN
Name the criterias for the formulation of the system purpose
Lösung anzeigen
TESTE DEIN WISSEN
-KISS / 1 sentence = 1 thought
-Refer to system (no elements)
-precise
-solution independent
-inspirational / figurative language
Lösung ausblenden
  • 52318 Karteikarten
  • 2051 Studierende
  • 48 Lernmaterialien

Beispielhafte Karteikarten für deinen PM/ Project Management Kurs an der Hochschule München - von Kommilitonen auf StudySmarter erstellt!

Q:
Was ist das Triple Constraint?
A:
-Magic Triangle
              Time    -    Cost 
                     -Quality-
-Each criteria is influenced by and influencing the others
-PM is proven to be the best way to achieve the best out of all three
Q:
Def. of Project
A:
A unique and temporary process, with coordinated and controlled activities, a definite start and finish date, it achieve a unique objective (product, Software or Service), has specific requirements, has a defined and accepted risk.
It ends when the objectives are achieved or they cannot be met as terminated
Q:
Welche Elemente dürfen bei einem system nicht vergessen werden ?

A:

SPIT       Tepidoil
Social.    People Organization
Process/Practice   Doctrine Trining
Information.     Information 
Technical.  Equipment Infrastructure Logistics
Q:
Def. of system
A:
is a combination of interacting elements organized to achieve toghether one or more stated purposes


need the interaction of the elements to achieve the stated purpose(s)
Q:
SE deals with?
A:
MINIMIZING Risk by preventing undesirable emergent properties 
MAXIMIZING desirable emergence 
Mehr Karteikarten anzeigen
Q:
Is SE worth the effort?
A:
Avoid integration problems see Europa launcher 
Higher Performance 
Rule Of Ten/Frontloading: Every Phase the cost factor multiplies with 10, Put more effort in the Early Phases such as requirement and design phase, can safe much money and time - Frontloading
Q:
Was trifft auf PM zu?

A:
one of the most crucial disciplines 
Q:
Nenne Beispiele für Disziplinen welche vom Systems engineer beachtet werden müssen. In versch. Kategorien einteilen: Fachdisziplinen, Subsysteme, System Life Cycle und Stakeholder
A:
Stakeholder: Kunde, Marketing, Finanzen und Controlling, PM, Einkauf, Supplier Händler,…
Fachdisziplinen: Software Engineer , Mech Engineer, ETechnik, Thermische Auslegung, EMV,…..
Subystem A , B(Triebwerk), C(Elektrik), ….
System Life Cycle: Forschung, InstandhaltungService, Test Zulassung, Produktion und Planung, Entsorgung
Q:
Nenne Succes Factors of SE
A:
Frontloading 
Focus on stakeholders 
Optimize the whole, focus on optimum architectures and interfaces
Systematische und Strikte Herangehensweise
Q:
Was sind die grundlegenden Concepts of SE ?
A:
-Systems Thinking
-Life Cycle Models
Q:
Definition of the System Vision
A:
System Purpose is the answer to the question WHY (WHAT FOR) the system is needed and states also the key success criteria and constraints 
Q:
Name the criterias for the formulation of the system purpose
A:
-KISS / 1 sentence = 1 thought
-Refer to system (no elements)
-precise
-solution independent
-inspirational / figurative language
PM/ Project Management

Erstelle und finde Lernmaterialien auf StudySmarter.

Greife kostenlos auf tausende geteilte Karteikarten, Zusammenfassungen, Altklausuren und mehr zu.

Jetzt loslegen

Das sind die beliebtesten PM/ Project Management Kurse im gesamten StudySmarter Universum

Project Management

Hochschule Furtwangen

Zum Kurs
Project Management

Hochschule Hof

Zum Kurs
Project Management 3

ETHZ - ETH Zurich

Zum Kurs

Die all-in-one Lernapp für Studierende

Greife auf Millionen geteilter Lernmaterialien der StudySmarter Community zu
Kostenlos anmelden PM/ Project Management
Erstelle Karteikarten und Zusammenfassungen mit den StudySmarter Tools
Kostenlos loslegen PM/ Project Management